Application Case
-
Mingtuo Group Industrial Gas Power Generation Project
The project is located in Baotou City, Inner Mongolia Autonomous Region. Mingtuo Group is the first company in China to adopt the world's advanced green alloy technology for the production of chrome ore pellets and ferrochrome alloys. The unit energy consumption and exhaust emissions are significantly lower than the national standard, and the equipment has been realized. Large-scale, intelligent production and cleanliness. Not only effectively save costs, but also greatly reduce environmental pollution. The closed furnace smelting technology used by Mingtuo makes the production process resource-saving and environmentally friendly. Compared with traditional smelting technology, it saves 10% of the reducing agent coke by 50,000 tons per year, 20% of the electricity by 950 million degrees, and 80% of the water by 9.50 million tons., Reduce 90% dust emissions by 561 tons, and reduce 94% sulfur emissions by 673 tons. -
Inner Mongolia Fengzhen Fengyu Industrial Tail Gas Power Generation Project
Installed capacity11×1.2MW
Inner Mongolia Fengzhen Fengyu Industrial Tail Gas Power Generation Project
The project is located in Fengzhen High-tech Industrial Park, less than 1 km away from the substation, and the power supply conditions are very superior. Fengyu Ferroalloy Co., Ltd. now has a production scale of 4 × 30MVA silicon-manganese furnace and 1 * 5MVA refining furnace, with a total equipment capacity of 143,500 kVA. It mainly produces and sells silicon-manganese alloy and medium-carbon-manganese iron, with an annual production of 200,000 tons of silicon-manganese alloy and 50,000 tons of medium-carbon-manganese iron.This technological upgrade includes: 4 new sets of silicone manganese purification system, gas transmission system, a new set of 9000m ³ dry rubber membrane sealed gas tank and pressurization system, the total installed capacity of the exhaust gas power generation project is 26.4MW, and the total planning configuration is 22 * 1.2MW Liyu's own brand generator set, which is planned to be built in two phases. The scale of the new power plant in the first phase is 11 × 1.2MW. The gas source comes from the 1 #and 2 #silicon-manganese closed furnaces. It is equipped with 11 Liyu independent brand LY1600GH-M 1.2MW industrial gas generator sets. The output voltage of the generator set is 10.5kV. After the boost transformer rises to 35kV, it is connected to the 35kV busbar section of the original high-voltage distribution room of the power plant along the cable trench with a loop cable. The generator set adopts the mode of being connected to the grid and not connected to the Internet. The power generation is all produced by Fengzhen Ferroalloy Co., Ltd. Power consumption, the insufficient part is replenished by the city network. -
Inner Mongolia Chayouqianqi Ferroalloy Exhaust Gas Power Generation Project
Installed capacity14×1.2MW
Inner Mongolia Chayouqianqi Ferroalloy Exhaust Gas Power Generation Project
The project is located in Chayouqianqi Industrial Park, Inner Mongolia. It is a 2 × 42000kVA fully enclosed high-carbon ferromanganese ore thermal furnace of Chayouqianqi Ferroalloy Company. It is equipped with 1 × 25 tons of CLU oxygen-blowing refining furnace and 1 × 3600kVA refining furnace exhaust gas for resource utilization. The technological upgrading includes: upgrading the gas purification and transportation, increasing the dual-mode gas cabinet, configuring 14 Liyu LY1600GH-M 1200kW industrial gas generating units, and building a new 16.8MW gas power plant. The annual power generation is expected to be about 134 million degrees after it is put into operation, which can save 43,000 tons of standard coal/year and reduce carbon dioxide 133,000 tons/year.