Application Case
-
Shenzhen Pingdi Biogas Power Generation Project
The project is located in Honghualing, Pingdi, Shenzhen. The project uses biogas from landfills as power generation fuel and is equipped with 2 LY12V170 Liyu gas-fired generating units. A single unit can output more than 950kW stably, and the annual power generation is more than 7.20 million degrees.The project uses the biogas generated by the landfill to generate electricity. It adopts an outdoor container type, the system is highly integrated, Plug and Play, and has high flexibility. The Liyu generator emits a voltage of 10.5kV, and the power generation efficiency is as high as 41%. The power supply of this project adopts a grid-connected mode.The project was completed, accepted and put into operation smoothly, which not only realized the effective use of energy, but also promoted the green and sustainable development of urban construction. At the same time, it also accelerated the application of Liyu unit in the field of landfill gas. -
Jiangxi Xinyu Zhenghe Biogas Power Generation Project
Installed capacity1×0.88MW
Jiangxi Xinyu Zhenghe Biogas Power Generation Project
The project is located in Jiangxi Zhenghe Ecological Agriculture Co., Ltd., Luofang Town, Yushui District, Xinyu City, Jiangxi Province. Jiangxi Zhenghe Ecological Agriculture is a provincial-level leading enterprise in agricultural industrialization in Jiangxi Province. It is committed to solving the environmental protection problem of breeding manure and building a green ecological recycling agricultural park, and has established a "N2N------ pig-marsh-fruit" regional green ecological recycling agricultural model. The agricultural waste treatment center and organic fertilizer center will fully quantitatively collect and treat manure and dead pigs produced by upstream "N" breeding enterprises, and connect downstream "N" planting parks to build regional green ecological recycling agricultural parks. Invest in the construction of biogas power generation projects to achieve reasonable and effective utilization of biogas energy.The project adopts 1 Liyu brand LY12V170 engine. After the project is completed, the annual power generation will be 8.8 million kW.h, which makes the manure from the farm turn gorgeous again and turn into clean electricity. While meeting the power plant's own electricity demand, the excess electricity will be The electric -
Guangdong Jiangmen Renke Sewage Treatment Plant Biogas Power Generation Project
Installed capacity1×1MW
Guangdong Jiangmen Renke Sewage Treatment Plant Biogas Power Generation Project
Guangdong Jiangmen Xinhui Renke Environmental Protection Co., Ltd. (Shuangshui Town Urban Domestic Sewage Treatment Plant) is located in Jiangmen City, Guangdong. The factory is specifically located at No. 68, Yingbin South Road, Shuangshui Town, Xinhui District, Jiangmen City. The designed treatment capacity is 5,000 cubic meters of sewage per day. In order to improve the urban water environment, control pollution, protect the water quality and ecological balance of the local watershed, and achieve the maximum and effective use of resources, a sewage treatment biogas power station will be built in the factory area.The project uses Liyu brand 1 LY1200 biogas generator set. While using biogas to provide electricity, the waste heat is also fully utilized. The container structure is adopted, which has high flexibility and portable maintenance, and the energy efficiency of the entire system is optimal. -
Hunan Changde Hongying Biogas Power Generation Project
Installed capacity2×1MW
Hunan Changde Hongying Biogas Power Generation Project
This project uses the idle coal storage shed site on the north side of the boiler room in the factory area of Hunan Hongying Biotechnology Co., Ltd. for production. The leased site area is 877m2. The biogas generated by the anaerobic tank of the sewage treatment station uses the sewage treatment station of Hunan Hongying Biotechnology Co., Ltd. The biogas pipeline has been built to connect to the project area for power generation.The project mainly constructs 2 1000kW gas-fired internal combustion generator sets, and supports 1 1.6t/h waste heat steam boiler, and constructs 1 set of biogas biological desulfurization system. After the project is completed, the annual power generation capacity is 12 million kW.h and the steam supply capacity is 9600t/a.