Changsha Huanghua International Airport Distributed Energy Station Project

delivery time:2022年05月19日    The author:

The project provides professional distributed energy station construction and operation services, and configures a LY1200 unit of Liyu brand to achieve the goal of "safe, reliable, stable and efficient, and common development" proposed by the airport, so that the energy system of Changsha Huanghua International Airport can achieve system optimization and The full utilization of waste heat from natural gas power generation not only promotes the efficient use of clean energy and the adjustment of energy structure, but also ensures the energy use safety of the airport in peak seasons of electricity and gas consumption or extreme climatic conditions.
The energy station adopts natural gas distributed energy, and the effect of energy saving and emission reduction is obvious. Compared with the conventional energy supply system, the energy saving rate of the whole system is 33%, the annual energy consumption is reduced by about 1527 tons of standard coal, and the carbon dioxide emission is reduced by about 3807 tons. It has made useful explorations and attempts for the sustainable development of energy in our province and the construction of "two-oriented society".